EPREVAEngineer Paper
ENERGYNewsElectricalEnergyTransport

GM and WeaveGrid launch V2G pilot with Southern California Edison

Eligible SCE customers can receive up to USD 8,000 toward a GM Energy V2H system and up to USD 8,099 toward installation costs.

EV with charge port open and cable connected, wall-mounted home inverter/charger unit on garage wall, suburban house and driveway setting, dusk lighting suggesting evening grid demand
AI-generated image

GM Energy and WeaveGrid are launching a vehicle-to-grid (V2G) pilot that will let select Southern California Edison (SCE) customers send electricity from their EV batteries back to the grid, according to Electrek. Eligible drivers could get more than USD 16,000 in help with equipment and installation, and earn money when the grid needs their power.

GM says the pilot participants will be its first EV drivers in California to export power from their cars to their homes — a company claim rather than an independently verified first. Through the California Energy Commission, eligible customers in SCE's Emergency Load Reduction Program can get up to USD 8,000 toward a GM Energy V2H system and up to USD 8,099 toward eligible installation costs, including connecting the system to the grid, according to the report.

Chevy, GMC and Cadillac EV drivers can use time-of-use energy management to take advantage of lower rates and may be paid for participating in eligible demand-response events. How much they save or earn depends on their rate plan, electricity use and participation. GM already offers managed charging through 13 utilities, and each program varies by utility.

An EV battery stores direct current (DC), while the house and grid use alternating current (AC). GM's current home backup system uses a wall-mounted inverter to convert the power; with AC bidirectional charging, the car's onboard inverter does the job. Moving that work into the car could make the equipment on the garage wall simpler and cheaper to install.

GM is joining CharIN's North American AC V2G task force, which is working to align technical standards, equipment certification and utility approval requirements. In Southern California, the pilot will give GM and its partners a look at how the process works for drivers, from signing up and getting the hardware installed to getting utility approval and sending power back. It remains a pilot: how much drivers ultimately save or earn will depend on their rate plan, electricity use and participation.

Key facts

  • Up to USD 8,000 toward a GM Energy V2H system for eligible SCE customers
  • Up to USD 8,099 toward eligible installation costs
  • More than USD 16,000 in potential help with equipment and installation
  • GM offers managed charging through 13 utilities

Sources

  1. GM’s V2G pilot wants to pay California drivers for power from parked EVs — Electrek

Other news outlets are named as sources but not linked.

Discussion

Technical questions and corrections are welcome. Comments are signed and checked before they appear.

No comments yet.

Sign in to add a typed review comment. Reviews are signed with your name.

More news